Lance Pearson
Petroleum
- Apr 17, 2024
- 2
If you add in a set of welded flanges in a run of pipe.
The spec allows for flanges and flanges are already in the system, do you need to do an MOC?
No change in the P&ID.
The spec allows for flanges and flanges are already in the system, do you need to do an MOC?
No change in the P&ID.