Is there a consensus on the wind load to be applied to steel girders in combination with wet concrete loads? AASHTO Guide Specifications for Wind Loads on Bridges During Construction specifies wind speeds for active (i.e. during erection) and inactive work zones. I'm assuming we don't need to consider the full inactive wind speed during the wet slab condition (typically 115 mph x 0.65 reduction factor for 0-6 weeks duration), since it only lasts a day or two and the slab wouldn't be poured in inclement weather. But the 20 mph "active" condition seems too low, since it's intended for erection only.