My boss always tell me to use at least double 2xs or LVLs when I have a beam. His reason was because you want more room nailing the floor joist/roof rafter connectors. So theres many time when I calculate beams I only need 1 LVL and he told me to put 2 instead. Do you guys do this also?
He also tell me to use at least 3 2xs or LVLs on 2x6 stud walls for headers because it will match the wall thickness. By doing this, the framer doesnt need to fill the gap that much. So he rather uses (3)-1 3/4x9 1/2 LVLs instead of (2)-1 3/4x11 7/8s LVL or (2)-1 3/4x9 1/2 LVLs
He also tell me to use at least 3 2xs or LVLs on 2x6 stud walls for headers because it will match the wall thickness. By doing this, the framer doesnt need to fill the gap that much. So he rather uses (3)-1 3/4x9 1/2 LVLs instead of (2)-1 3/4x11 7/8s LVL or (2)-1 3/4x9 1/2 LVLs