Looking ahead to after this well on my platform, the next job is a workover where we are going to cut & pull the top 850ft of 9-5/8" casing due to unacceptable casing wear, backoff the stub down hole (using Red Baron's casing backoff assembly)and then run ~850ft of new 9-5/8" casing and make this up the the stub downhole.
I've never done this before, and I'm very, very nervous... does anyone out there have any experience of doiong this and able to pass on any hints and tips? Cheers!
(I guess there's a reason why we aren't doing a simple thing like an external casing patch, but the guys in town certainly aren't telling us!)
I've never done this before, and I'm very, very nervous... does anyone out there have any experience of doiong this and able to pass on any hints and tips? Cheers!