Energyfit24381
Electrical
- Jan 5, 2024
- 27
Looking for confirmation on zero sequence philosophy as it pertains to Distributed Energy Resources. I am converting a site with multiple meters to a singular main primary PCC/primary service point. I am creating the protection scheme which is pretty much done but was told im still lacking zero sequence continuity to the customer secondary. We have a 12.47/480 V Y-Y transformer that will feed mutliple transfer switches and gens.
Specifically, the concern that was bought up to me is that the protective devices that i have so far on the secondary are not able to detect and control for phase to ground faults on utility primary equipment without zero sequence continuity. Can someone shed light on zero sequence philosophy and how to implement?
“If my critics seen me walk on water they would say its because i cant swim”
- M.T.-
Specifically, the concern that was bought up to me is that the protective devices that i have so far on the secondary are not able to detect and control for phase to ground faults on utility primary equipment without zero sequence continuity. Can someone shed light on zero sequence philosophy and how to implement?
“If my critics seen me walk on water they would say its because i cant swim”
- M.T.-