Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by blaqesmith

  1. blaqesmith

    Change of Electrode

    you are saying that E6018 can be used instead of E7018???
  2. blaqesmith

    Change of Electrode

    Dear All, As per ASME Section IX QW-404.33 Classification of electrode is essential. So guide my about following: I have a PQR, Process : SMAW Material: SA-516 Gr 70 Electrode : E7018 Can i change this electrode E-6018???? Chemical analysis of E6018 also as per A-1 Note: Chemical analysis of...
  3. blaqesmith

    preheat temperature

    Decrease in Pre heat is essential variable so you should note temperature value.
  4. blaqesmith

    Qualification of PQR

    thanks, for you response @DD & metengr
  5. blaqesmith

    Welder Continuity

    @DekDee you are right. i am sorry for my reply
  6. blaqesmith

    Qualification of PQR

    @DD why 0.353 as per note "a" of figure QW-462.1 (d), we can extract sample having diameter of 0.505. so should i move to 0.505 or 0.353???
  7. blaqesmith

    Welder Continuity

    yes required
  8. blaqesmith

    Qualification of PQR

    I am asking about QW 462.1 (d). Can i use this type of specimen for tensile testing while i am using a plate of 16 mm thickness.
  9. blaqesmith

    Qualification of PQR

    Please reply as per ASME Section IX Can we use turned specimen ( Tensile) for qualification of PQR. Material: 516 Gr 70 Thickness: 16 mm Process : SMAW Electrode: E7018 PWHT/PRE Heat: N/A See QW 151.3 & QW-462.1 (d)
  10. blaqesmith

    inspection of dents in pressure vessel

    thnx. I am trying ton resolve it, i will txt you or write a thread here if i find any issue regarding this
  11. blaqesmith

    WPS issue

    Back pass mean , welding from root side
  12. blaqesmith

    WPS issue

    Please clarify me ASME IX says Addition of backing is non essential variable and does not address deletion of bakcing so tell me how can i resolve this issue
  13. blaqesmith

    WPS issue

    Dear experts please tell me solution for following problem. There is a PQR with following variables Plate thickness 14 mm Technique GTAW Root with GTAW process with back pass Question: Now my question is, can i use a WPS using aforesaid PQR without using Back pass. Keep in mind that according...
  14. blaqesmith

    inspection of dents in pressure vessel

    Dear experts, i am inspecting a Pressure vessel as per API 510. There is a dent in shell having diameter of 2 feet and depth of 5 inches. How i can evaluate it? please suggest me code clause or tell me solution of this problem with good engineering practice.
  15. blaqesmith

    API 653 Code issue

    what is meant by 50 % of required? How to calculate required area?

Part and Inventory Search