Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SDETERS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by WesternJeb

  1. WesternJeb

    Steel Framed Balcony to House Attachment

    Put a steel face plate on the face of brick to weld the channels to. Send 1" dia,. steel rods (or similar) thru the brick to some steel plate system on the wood studs and inject the holes with caulk/ epoxy. This is what I see pretty commonly on premanufactured shade structures to help limit...
  2. WesternJeb

    Embedded Column Base Plate

    I reinforced a PEMB column one time like this. We removed an interior column and distributed the load to the two adjacent interior columns. To gain the additional capacity (reduce the buckling length), we encased the bottom 6' of the steel post columns in concrete to restrain buckling and sold...
  3. WesternJeb

    Weld Material Overstrength

    dold, Nominal capacity (as posted by Simpson) is 43 kips apiece, or 86 kips. That was the average value at failure, so I am putting a 1.2 factor on that for a total nominal load of 103 kips. I agree that 140 kips is much larger than this and it should be fine, but just wanting to get some...
  4. WesternJeb

    Weld Material Overstrength

    bones206, the nominal capacity of the hold downs I am using is 86 kips in tension and I am putting a 1.2 factor on that to include a safety factor. The nominal capacity of the welds I am sizing are meant to match/exceed the nominal capacity of the hold downs. The full intent is to develop the...
  5. WesternJeb

    Weld Material Overstrength

    @canwesteng, I agree under every other circumstance. However, I am designing a host building component to separate from the storm shelter wall and am welding some simpson hold downs to an embed. plate in a storm shelter. I believe the hold downs will fail before the welds, but my office all...
  6. WesternJeb

    Weld Material Overstrength

    Is anyone aware of a material over-strength factor for 70 ksi welding rods? Something similar to how ASTM A992 steel has an Ry = 1.1 and Rt = 1.1 that is published in AISC 341 but I can't find anything on welding rods. I am needing to design a component to withstand the full strength of a...
  7. WesternJeb

    Design Program Documentation

    I really like that approach that is more of the minimal effort / information but good CYA language. I guess I was operating under if there is a subpoena, there wouldn't be an opportunity to get in the design files and print them out.
  8. WesternJeb

    Verification of percentage based payment for engineering services

    You didn't have to say it out loud, LOL! It does require a certain code of ethics operating under these type of contracts. Usually, these are projects in which a clients budget is established up front and the design team isn't to go over that budget. That is the "check and balance" with these...
  9. WesternJeb

    Design Program Documentation

    Just curious what others practice is.. When we design structures using Risa, Enercalc, Tedds, etc., are you all printing out design reports? Up until this point that hasn't been something I have typically done but I am not quite sure what all is required from the legal standpoint. Is having...
  10. WesternJeb

    RISA 3D: WLY in LC Generator

    I (and my firm) have always defined these as OL1 and OL2 to designate the difference in positive and negative pressures wind. We then just have to go thru and manually put them in with the applicable load factors. While it is annoying, it doesn't take me more than 5 minutes nowadays.
  11. WesternJeb

    Verification of percentage based payment for engineering services

    My experience with these kind of projects is that the design team also covers CA (construction admin.) services. This should see you thru to the end of the project and then you have to have the tough conversation that no one likes to have - you need more money. Rarely do the architects (usually...
  12. WesternJeb

    Adding Steel Beam Below Exist. Conc. Beam

    Tomfh, going to disagree all around with you here. As far as your statement of it being impractical, that is why I choose to take the route of developing a composite section as well. It seems much more reliable and I don't have to count of the concrete beam potentially failing with flexural...
  13. WesternJeb

    Adding Steel Beam Below Exist. Conc. Beam

    EngDM, correct. Very similar to using headed studs on a steel beam into a concrete slab. I usually default to anchor spacings @ 12" o.c. and see what % composite that gets me. Keep in mind, I am only trying to gain the additional capacity needed, not get a fully composite section!
  14. WesternJeb

    Adding Steel Beam Below Exist. Conc. Beam

    I am going to take a different approach.. I have tried to do this before and the sizes I get are massive, too massive for the ceiling area constraints... How about trying a composite beam? Send some post-installed anchors thru the flange of the beam and into the bottom of the concrete beam...
  15. WesternJeb

    Weld Penetration

    Just wanting to add that the weld doesn't even look good for what its supposed to be. I am seeing some porosity on the far left? Aside from the intent of the weld, it would have to be dang near perfect for my to accept it and it isn't.

Part and Inventory Search