Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Marmite

    maximum direct burial hv cable depth

    Another consideration needs to be practicality of access in the future for repair if the cable ever goes faulty. Going deeper will increase the cost of excavation and the complexity of the excavation. Consider using conduits. If you are direct burying for rating then an option is to fill the...
  2. Marmite

    BVP22 Manual

    Second try with the BVP17 Manual. Regards Marmitehttps://files.engineering.com/getfile.aspx?folder=f02fa069-bb5d-4923-90b6-62dacaff6067&file=BVP17MET.PDF
  3. Marmite

    BVP22 Manual

    Have a look here for your contacts:- https://www.alcomet.net/oil-circuit-breaker-contacts/gec-aei-switchgear-contacts. They list BVP22 as well as BVP17. I don't have the BVP22 manual but I have a BVP17 manual. See link. Isn't it time you got these old things off your system, or at least fit...
  4. Marmite

    Anti Condensation Heaters / General Electrical Loads - Medium Voltage Switchgears (PV Plants)

    Switchgear panel heaters are not normally considered essential loads. Protection, SCADA, Comms, Security, emergency lighting and fire systems are essential loads. If you only have battery capacity to sustain essential loads for 2 hours after loss of mains power, then I wouldn't be worrying about...
  5. Marmite

    Interconnection wiring diagrams for system integration

    My experience is similar to Scotty's. Manufacturer supplied drawings are provided with a corporate drawing number and CAD border. The drawing number typically has a substation identifier, whether its civil, electrical etc, and whether its a layout or a schematic etc, so you typically want the...
  6. Marmite

    Price for Neutral Earthing Resistor

    And another. https://www.cressall.com/neutral-earthing/ Rwgards Marmite
  7. Marmite

    ASL and generation

    Probably because the ASL wouldn't necessarily clear the downstream fault, which could be maintained by backfeeding from the generator, or the remaining two live phases. If the generator is connected via a delta star transformer with the delta facing the generator and the star feeding out to the...
  8. Marmite

    Mid span standing voltage - solid bonded cables

    There isn't any voltage that is sensible to calculate or measure. It is shunted by the sheath to earth bonds. The issue becomes one of circulating current rather than of voltage.If you really wanted to calculate the voltage between two arbitrary points, calculate the circulating current and the...
  9. Marmite

    Bus Phase Sequencing in MV Switchgear

    I've worked in Companies where there are all kinds of legacy system phasing standards. In the UK system phasing uses the colours Red, Yellow and Blue, and by convention you would expect them to correlate with ABC physical terminals, but that isn't necessarily so. It's important that the...
  10. Marmite

    MV Cables Shield Grounding

    Has the cable rating study been based on single point bonding? If it has then solidly bonding the installation would potentially derate the cables. For your wind turbine feeder there is likely to be less of an effect because the current must be reasonably low if you are only using 1 cable per...
  11. Marmite

    Transformer Protection

    Standby earth fault protection is as RRaghunath described. It is not normally switched in or out of service. Just another example how the same words can mean different things to different people. Broken delta/open delta are other fine examples. SBEF protection is sometimes staged, for example if...
  12. Marmite

    Copper Conductors datasheet

    If it's an overhead line it would be hard drawn copper. The rating depends on the design operating temperature of the line, ambient temperature, solar intensity and wind speed. Is it ratings you are looking for, or physical parameters? Regards Marmite
  13. Marmite

    Manufacturer of this reactor

    Haefely became Trench. See http://trenchgroup.com/en/Company/Siemens-Ltda.-Brazil Regards Marmite
  14. Marmite

    predicting failures of high voltage power cables

    EA Technology in the UK has a range of products that would fit the bill. https://www.eatechnology.com/engineering-products/partial-discharge-solutions/cabledata-collector/ Regards Marmite
  15. Marmite

    Active fire fighting for the switchgear room

    I would think that this would be a no brainer if it is indeed a "critical switchgear room on an offshore platform". There is an existing active fire fighting system in place, so someone must have decided at the time that the risk of a fire happening, or the consequences of a fire were so...
  16. Marmite

    Estimation of Short Circuit forces inside Multicore cables

    With multicore cables the forces are contained within the cable and do not have any bearing on the selection of cleats. The cable manufacturer designs the cable with sufficient strength to avoid bursting under fault current scenarios. As long as you specify a cable that is adequately rated for...
  17. Marmite

    Ground continuity conductor with multicore cables

    If the screen is adequately rated for the fault current then you wouldn't need the ground continuity conductor for a multicore cable installation. Generally as your cable rating requirements increase you would move to single core cables, in which case for a given cable size you can get more out...
  18. Marmite

    Flux coupling among primary secondary and teritary in three winding transformer

    There are basically two alternatives for the transformer. It can have either close-coupled or loosely-coupled secondaries. Both LV windings have to be disposed symmetrically with respect to the HV winding so that they have identical impedances. There is a crossover between the two LV windings...
  19. Marmite

    About work in different countries.

    The procedures outlined are all standard practice in transmission/distribution utilities I have worked in both in the UK and Australia. Sure, there are some variances, but the basic principles are the same. The HV equipment is isolated and earthed by a switching operator. (in some Companies this...
  20. Marmite

    IR CONSAC

    This old UK Power industry document gives the original factory test details. Might be of use. Regards Marmitehttp://files.engineering.com/getfile.aspx?folder=32bba928-b63a-4a74-ab0b-06255eb4893c&file=TECHSPEC_9-8_(1977).pdf

Part and Inventory Search