I-beam
Structural
- Oct 6, 2019
- 26
I have a steel stair fabricator who would like to use a single 3/4" A-325SC bolt to connect a landing support beam (C4)to a header. The single bolt connection is adequate for the 1500# reaction, but do you have to use the AISC 2-bolt minimum requirement for a stair. Does anyone know of the rational behind the 2-bolt minimum, other than for redundancy?