RRaghunath
Electrical
- Aug 19, 2002
- 1,716
I read that the subject wind farm, commissioned in 2018, is down since 26th Oct'2019 due to failure of under-sea HV cable.
Any details how it failed, is it a straight-through joint or some thing else!!
Any details how it failed, is it a straight-through joint or some thing else!!