Hi I want to apply a connector with a "stop" behaviour to a part with approximately 6000 nodes. Is there a quick way of repeating this process or can it all be done at once using a set. One point of the connector is connected to ground
I'm not sure about your part geometry, but you can have a script to select the nodes by their coordinates, finally add them to a set.
leaving the model here may help me to a have better perception about it.