I am now confusing about Calibration requirement for Safety relief valve (SRV), which is a part of pressurized Package.
My opinion is the SRVs shall be calibrated at the construction site, so after that we are allowed to install SRVs on the vessel. Even SRVs have tested and certified at the manufacturer or at Package vendor's factory already.
However, Some people told me that the re-work is not required. I explained about the re-calibrated requirement after 5 (or few) years. But it seems that they were not convinced. They just want to save the construction cost.
Can anybody advise is there any code or company standard about that issue?
My opinion is the SRVs shall be calibrated at the construction site, so after that we are allowed to install SRVs on the vessel. Even SRVs have tested and certified at the manufacturer or at Package vendor's factory already.
However, Some people told me that the re-work is not required. I explained about the re-calibrated requirement after 5 (or few) years. But it seems that they were not convinced. They just want to save the construction cost.
Can anybody advise is there any code or company standard about that issue?