Hi All,
I am designing a two-story parking structure under the groundwater level with dimensions 600 feet x 600feet, the whole building is submerged under the water moreover, we want to connect the parking building to an existing tunnel.
I have three questions:
1- Can we provide expansion joints in the slab every 150 feet but we will not extend to the retaining wall due to the high water level?
or you recommend casting the whole slab and wall without any expansion joint only construction joint?
2- I believe we need a settlement joint between the existing tunnel and the new building, did you know how can we construct such a settlement joint under groundwater level? and do you recommend an alternative solution to avoid any water leakage at the connection between the existing tunnel and the building?