Looking for suggestions to figure out how to resolve a canopy support issue.
I designed a canopy support at the Overhead garage door openings at a building for the configuration proposed by the architect.
The structural framing is primarily HSS tubes supporting the canopy deck with HSS members forming a bracket at the ends. The brackets are anchored to the reinforced masonry walls.
Section of canopy support showing End bracket:
The architect did not want to see the underside of the steel deck so I ran a 3/8" steel plate under the deck and also used the plate to support the last 12" of the canopy adjacent to the brick veneer. This last 12" portion of the steel plate is supported on the HSS member on one side and on the brick veneer on the other end (plate extends into the mortar joint). This 12" portion of the plate carries the load from the gutter and also snow drift above it from building roof above.
Section of canopy support directly above garage door opening:
The framing was hot-dipped galvanized. However, looks like it was not clamped or braced adequately during the process and the free ends of the plate has warped and distorted.
The ends of the plate no longer line up within the mortar joint.
Any suggestions on how I could fix the issue and support the plate end at the brick veneer?
I designed a canopy support at the Overhead garage door openings at a building for the configuration proposed by the architect.
The structural framing is primarily HSS tubes supporting the canopy deck with HSS members forming a bracket at the ends. The brackets are anchored to the reinforced masonry walls.
Section of canopy support showing End bracket:
The architect did not want to see the underside of the steel deck so I ran a 3/8" steel plate under the deck and also used the plate to support the last 12" of the canopy adjacent to the brick veneer. This last 12" portion of the steel plate is supported on the HSS member on one side and on the brick veneer on the other end (plate extends into the mortar joint). This 12" portion of the plate carries the load from the gutter and also snow drift above it from building roof above.
Section of canopy support directly above garage door opening:
The framing was hot-dipped galvanized. However, looks like it was not clamped or braced adequately during the process and the free ends of the plate has warped and distorted.
The ends of the plate no longer line up within the mortar joint.
Any suggestions on how I could fix the issue and support the plate end at the brick veneer?