Dear Gents,
kindly be informed that we had three caterpillar diesel generators 750 KVA (model: 3412) which are synchronizing with each other and synchronize with the national grid for load sharing and load transfer throug woodward EGCP-2 contol panels but during the last past days we notice the following problem: -
Generator address No.2
•Without synchronizing order: The speed during test mode or running from the local panel is 1500 RPM without hunting or fluctuation.
•With synchronizing order: The speed during running mode is fluctuating between 1490 to 1510 RPM with hunting which led to the generator doesn’t synchronize with the other generators or with the national grid as a single unit.
Does anyone know how to solve this problem?
Thanks,
kindly be informed that we had three caterpillar diesel generators 750 KVA (model: 3412) which are synchronizing with each other and synchronize with the national grid for load sharing and load transfer throug woodward EGCP-2 contol panels but during the last past days we notice the following problem: -
Generator address No.2
•Without synchronizing order: The speed during test mode or running from the local panel is 1500 RPM without hunting or fluctuation.
•With synchronizing order: The speed during running mode is fluctuating between 1490 to 1510 RPM with hunting which led to the generator doesn’t synchronize with the other generators or with the national grid as a single unit.
Does anyone know how to solve this problem?
Thanks,