Dear Seniors,
I am preparing Cold tie in pipeline procedure, for 36’ pipeline to tie in with 34’ pipeline and after 20km will tie in back by 36 inch pipeline because our company want to use new 34 inch pipeline which is going to be abandoned before our tie in (dilute bitumen) which laid 6 months ago.There is a two stopple available for plugging.
What king of vacuum truck I had to use to suck 20 km of dilute bitumen which is stagnant?
I don’t have drain line so do I need to hot tap for 2’ for using as drain line?
Will this 2’ drain will enough to vacuum the 20km inside product?
What kind of seal I have to insert near by plugging?
What kind of tray or catch basin I have to keep for cutting the 34 inch pipeline to collect the any substance from the pipeline?
Thanks
JoseEnb
I am preparing Cold tie in pipeline procedure, for 36’ pipeline to tie in with 34’ pipeline and after 20km will tie in back by 36 inch pipeline because our company want to use new 34 inch pipeline which is going to be abandoned before our tie in (dilute bitumen) which laid 6 months ago.There is a two stopple available for plugging.
What king of vacuum truck I had to use to suck 20 km of dilute bitumen which is stagnant?
I don’t have drain line so do I need to hot tap for 2’ for using as drain line?
Will this 2’ drain will enough to vacuum the 20km inside product?
What kind of seal I have to insert near by plugging?
What kind of tray or catch basin I have to keep for cutting the 34 inch pipeline to collect the any substance from the pipeline?
Thanks
JoseEnb