haideeb
Structural
- Nov 28, 2018
- 10
Referring to a flat slab construction.. With the column designed to higher concrete grade than the slab, current detail shows pouring the portion of the slab around the column with concrete of grade same as that of the column. This is quite difficult to implement on site. Can anyone lead me to referrences on how this can be avoided, i.e. pouring whole slab to one concrete grade?