Liam Nesson
Structural
- Sep 8, 2016
- 61
Hi All,
I have approximately 25 heavy industry sites with frost depths varying from 450mm to 3m. For the sites with high frost depth we are using a raft foundation (to support pre-engineered single storey buildings) approximately a meter below grade and then have frost insulation that runs under the raft and beyond 2m either side. Another discipline wants us to put a concrete post foundation (say 450mm dia) through the insulation, has anybody done this and how have the addressed the cold bridge? I am thinking to make the post square and put insulation around the post down whatever depth i need, however i have not done this before. The post will take a small force (say 5kn of equipment) and should not have large lateral loads, it will be about 2m high.
I have approximately 25 heavy industry sites with frost depths varying from 450mm to 3m. For the sites with high frost depth we are using a raft foundation (to support pre-engineered single storey buildings) approximately a meter below grade and then have frost insulation that runs under the raft and beyond 2m either side. Another discipline wants us to put a concrete post foundation (say 450mm dia) through the insulation, has anybody done this and how have the addressed the cold bridge? I am thinking to make the post square and put insulation around the post down whatever depth i need, however i have not done this before. The post will take a small force (say 5kn of equipment) and should not have large lateral loads, it will be about 2m high.