SteelPE
Structural
- Mar 9, 2006
- 2,759
I have a 12” thick suspended slab that is used for an elevated parking area. The slab is constructed on top of steel beams and form deck. In order to prevent water from leaking through the slab the owner wants to apply a waterproof membrane ontop of the slab and then apply a structural toping(for protection of the membrane)after the membrane has cured. The membrane is a “one part, rapid moisture curing aliphatic polyurethane waterproofing membrane”. The manufacture says that this material can be applied to “green” concrete but I am not sure if it will effect the strength of the concrete in the end.
How long should you let the structural slab cure prior to applying the waterproof membrane?
How long should you let the structural slab cure prior to applying the waterproof membrane?