I have an area in a residential building where I have double height columns, the column line right next to these column have a mezzanine with a cantilever slab sticking out. Now the clint wishes to not have double column are and convert it into two floors for office use. The question is how to cast and connect a slab to the existing cantilever slab and column so that they work as one simiply supported slab spanning between the two columns.
The solution I came up with was to have WF beam retrofitted to span between the columns, and steel deck with concrete slab spanning between the double height columns and cantilever slab. I will have embeds at regular intervals sticking out of the existing cantilever slab so as to connect to the new cast concrete above the steel deck and create a moment connection.
Is this a good effective solution? Is there any other more simple solution?
The solution I came up with was to have WF beam retrofitted to span between the columns, and steel deck with concrete slab spanning between the double height columns and cantilever slab. I will have embeds at regular intervals sticking out of the existing cantilever slab so as to connect to the new cast concrete above the steel deck and create a moment connection.
Is this a good effective solution? Is there any other more simple solution?