Gercivil
Structural
- Apr 4, 2009
- 13
Hi, I have a problem in one of our apartment project it is about 10 to 15years old. The roof topping have many cracked with a 10 to 20mm vertical movement. In one portion of the roof water leaks, the rain water pass through the adjoining joint of the hollowcore slab.
Our preliminary assessment is that there is a defect with the water proofing membrane, in which, an expansion in the material cause the vertical movement.
Roof Topping Detail:
-50mm conc screed
-800micron water proofing membrance
-50mm polyurethane insulation
I need second opinion to the problem...
Our preliminary assessment is that there is a defect with the water proofing membrane, in which, an expansion in the material cause the vertical movement.
Roof Topping Detail:
-50mm conc screed
-800micron water proofing membrance
-50mm polyurethane insulation
I need second opinion to the problem...