anonymous119
Structural
- Jun 20, 2012
- 17
Dear all I have a task to design a steel structure for 3 canopies with the following specifications
1. 25x15 meters
2. 75x8 meters &
3. 700 Sq. meters (Overall)
The design is relatively in the initial stage and its just been demanded by our estimation section in order to give price of an inquiry. I am relatively fresh in steel structures but I am aware of AISC code and software tools like STAAD Pro. I have designed steel structures before for supporting architectural works, but such a structure is quiet bigger for me than the earlier ones. I have already design the 3 structures and send the steel detail to the estimation section. But the problem still remains there, that how come I be sure about the structures' safety because I don't fully believe on the software's result. Also there is an issue that I am the only Engineer who can do the structural design in my company. Please I need valuable information that how to proceed in future if our company gets the project.
Note: In my design I used trusses made up from equal angle section, I thought to use tapered section but later on abandoned the idea because of the bracing requirement for such a large structure.
1. 25x15 meters
2. 75x8 meters &
3. 700 Sq. meters (Overall)
The design is relatively in the initial stage and its just been demanded by our estimation section in order to give price of an inquiry. I am relatively fresh in steel structures but I am aware of AISC code and software tools like STAAD Pro. I have designed steel structures before for supporting architectural works, but such a structure is quiet bigger for me than the earlier ones. I have already design the 3 structures and send the steel detail to the estimation section. But the problem still remains there, that how come I be sure about the structures' safety because I don't fully believe on the software's result. Also there is an issue that I am the only Engineer who can do the structural design in my company. Please I need valuable information that how to proceed in future if our company gets the project.
Note: In my design I used trusses made up from equal angle section, I thought to use tapered section but later on abandoned the idea because of the bracing requirement for such a large structure.