I am using SolidWorks 2006. I try my hardest to use SolidWorks properly, so that I can take advantage of all of its automated functions. Therefore, I have a tendency to include all nuts, bots, washers, etc. in my assemblies, so that I do not have to overide any quantities in my BOMs. I try not to overide the BOMs because I loose connectivity (that just doesn't sit well with me). Am I just being anal? What do you folks do to address this issue? Is there a better way to trick the BOM, other than overiding the QTY. directly? Thank you very much.
I am eager to read any thoughts or comments on this topic!
I am eager to read any thoughts or comments on this topic!