I was in a discussion with a friend earlier tonight and we disagreed over what is allowable with regard to dowels exposed in a section of SOG that will serve to connect to an additional port of SOG to be poured later - no set timeframe.
I say dowels are acceptble so long as they are not scaly with rust or lose cross sectional area. He says dowels must be installed via a HILTI epoxy.
This is a discussion about a residential outbuilding, and I have realized I am not very familiar with residential codes as he says they are very different than UBC codes.
Anyway, I am in Georgia, anyone want to shed any light?
Thanks,
Daniel
I say dowels are acceptble so long as they are not scaly with rust or lose cross sectional area. He says dowels must be installed via a HILTI epoxy.
This is a discussion about a residential outbuilding, and I have realized I am not very familiar with residential codes as he says they are very different than UBC codes.
Anyway, I am in Georgia, anyone want to shed any light?
Thanks,
Daniel