philipdmartin
Military
- Jan 30, 2011
- 3
I saw on another thread some discussion about having a casting drawing and a machined drawing if you're using different vendors. In my case I have one vendor doing it all, cast-machine-assemble, and I was wondering can I still have seperate drawings? It seems a lot cleaner if I break the two/three apart. The casting department of the vendor can focus on the casting drawing, the machining department the machining drawing and the assembly area the assembly drawing. Can the casting drawing have datums ABC or should it only have XYZ? I'm assuming the machining and assembly drawing should share the same datums unless functionality comes into play but I'm not sure. I know there's a lot packed in this thread but any thoughts would be extremely helpful. Thank you.
Phil
Phil