r2d22
Structural
- Oct 3, 2007
- 11
Some cores 3" (diameter) and 6" (length) have been taken (horizontally) from existing concrete columns. What would you recommend to fill the hole? Is there any recommended specification from ACI? Using an epoxy based primer to bond new and existing concrete is correct? Thanks for your advice.
ArturoM
ArturoM