Ganesh Persaud
Structural
- Nov 21, 2018
- 94
Hello everyone,
What’s the allowable period to keep formwork in place for a rc wall before adding fill and compacting. In this instance my wall is 4ft in height and 6 inches thick.
Thank you
Ganesh Persaud
What’s the allowable period to keep formwork in place for a rc wall before adding fill and compacting. In this instance my wall is 4ft in height and 6 inches thick.
Thank you
Ganesh Persaud