radiocontrolhead
Structural
- Mar 4, 2017
- 95
Am I being unrealistic with my design here?
parameters:
-Handrail load = 200 lbs
-moment arm from hand rail to deck framing resultant = 5'-0"
-diaphragm capacity = 480 lbs (asd)
-distance between tension rods = 6"
-deck joist spacing = 16" o.c.
The biggest challenge was resolving the tension force into the deck diaphragm. The deck subframing for drainage has already been installed or a strap or B.N. from above would be considered.
Thanks all in advance.
parameters:
-Handrail load = 200 lbs
-moment arm from hand rail to deck framing resultant = 5'-0"
-diaphragm capacity = 480 lbs (asd)
-distance between tension rods = 6"
-deck joist spacing = 16" o.c.
The biggest challenge was resolving the tension force into the deck diaphragm. The deck subframing for drainage has already been installed or a strap or B.N. from above would be considered.
Thanks all in advance.