rushitbvm
Structural
- Jul 22, 2015
- 2
In structural analysis on CASAD software, there are two types of working systems, we keep column end node either fixed or pinned with the footing.
1) What are the site conditions or any detailing privileges to consider them (column footing joints) as fixed or pinned.
2) are there any benefit in economy on either side
3) which type of commencement is more realistic and safe as well
1) What are the site conditions or any detailing privileges to consider them (column footing joints) as fixed or pinned.
2) are there any benefit in economy on either side
3) which type of commencement is more realistic and safe as well