ntuedutw
Mechanical
- Sep 5, 2006
- 9
Hello,
If you have a part with only one datum reference frame(DRF){A,B,C}. A is a planar surface which has a form control, B is a external shaft which has a position geometric control reference to Datum feature A under RFS condition and C is also a external shaft which has a position control reference to datum features A & B under RFS condition. Then, we put the part on the specified fixture and start building the DRF{A,B,C} first on CMM and go for the measurements.
How could we measure the position controls of datum feature B & C?
(1) The position control of shaft B is to refer to Datum Feature A. It's just only one Datume feature( Plane A) in its own feature control frame, not the whole DRF{A,B,C}
(2) The position control of shaft C is to refer to Datum Feature A & B only in its own feature control frame, not the whole DRF{A,B,C}.
Does any one konw this concept? It doesn't make sense for me to imagine that we could setup the DRF{A,B,C} first and go for measuring the position controls of shaft B & C under this DRF in CMM metrology.
Many thanks,
Ntuedutw
If you have a part with only one datum reference frame(DRF){A,B,C}. A is a planar surface which has a form control, B is a external shaft which has a position geometric control reference to Datum feature A under RFS condition and C is also a external shaft which has a position control reference to datum features A & B under RFS condition. Then, we put the part on the specified fixture and start building the DRF{A,B,C} first on CMM and go for the measurements.
How could we measure the position controls of datum feature B & C?
(1) The position control of shaft B is to refer to Datum Feature A. It's just only one Datume feature( Plane A) in its own feature control frame, not the whole DRF{A,B,C}
(2) The position control of shaft C is to refer to Datum Feature A & B only in its own feature control frame, not the whole DRF{A,B,C}.
Does any one konw this concept? It doesn't make sense for me to imagine that we could setup the DRF{A,B,C} first and go for measuring the position controls of shaft B & C under this DRF in CMM metrology.
Many thanks,
Ntuedutw