greenimi
Mechanical
- Nov 30, 2011
- 2,261
IF (again IF)
datum features B and C are to be modified at MMB or LMB
and
Note 3 is changed to "DRAFT ADDS MATERIAL"
what would be the appropriate sizes of the applicable boundaries? (sizes of datum feature simulators)
(from ASME Y14.8-2009)
MMB(B)=? MMB(C)=?
LMB(B)=? LMB(C)=?
datum features B and C are to be modified at MMB or LMB
and
Note 3 is changed to "DRAFT ADDS MATERIAL"
what would be the appropriate sizes of the applicable boundaries? (sizes of datum feature simulators)
(from ASME Y14.8-2009)
MMB(B)=? MMB(C)=?
LMB(B)=? LMB(C)=?