James7443
Mechanical
- Jul 11, 2014
- 23
Is these any ASME standard that indicates whether or not the assembly drawing BOM (parts list) needs to exactly match a MRP generated BOM?
My question revolves around items such as shipping materials (preformed foam blocks, manuals, crates, etc..). The assembly drawing lists all of the parts required to build the product including things like grease, thread lock, epoxy, et.. and place the finished item in inventory. However the MRP system adds a few things, that have cost, like shipping material, manuals, etc.. when the shipping department packages the product for delivery.
Thanks
My question revolves around items such as shipping materials (preformed foam blocks, manuals, crates, etc..). The assembly drawing lists all of the parts required to build the product including things like grease, thread lock, epoxy, et.. and place the finished item in inventory. However the MRP system adds a few things, that have cost, like shipping material, manuals, etc.. when the shipping department packages the product for delivery.
Thanks