Does anyone have any experience with the requirements for a lane transition/offset taper?
I have located the formula in Chapter 6 of the MUTCD which notes that you can use the L/2 for a transition taper where L is the taper length for a merging taper.
I have been told that the L/2 is only applicable to temporary traffic control since this is found in Chapter 6 of the MUTCD for temporary traffic control.
Part 3 of the MUTCD gives the same formula for the taper requirements but does not allow the L/2 to be used for a transition/offset taper. Part 3 of the MUTCD does not make any mention of the difference between a mering taper and a transition/offset taper.
The only reference I have found to the transition/offset taper is that of a transition across an intersection but there is no formula for this transition or maximum allowable offset noted.
Where can I find the length requirements for a permanent lane shifting/offset taper?
SMP
I have located the formula in Chapter 6 of the MUTCD which notes that you can use the L/2 for a transition taper where L is the taper length for a merging taper.
I have been told that the L/2 is only applicable to temporary traffic control since this is found in Chapter 6 of the MUTCD for temporary traffic control.
Part 3 of the MUTCD gives the same formula for the taper requirements but does not allow the L/2 to be used for a transition/offset taper. Part 3 of the MUTCD does not make any mention of the difference between a mering taper and a transition/offset taper.
The only reference I have found to the transition/offset taper is that of a transition across an intersection but there is no formula for this transition or maximum allowable offset noted.
Where can I find the length requirements for a permanent lane shifting/offset taper?