Hi all, I am designing a multi-storey buidling which has a transfer slab on the frist floor. Because of this transfer slab, the walls above 1F cannot work as shear wall as they dont go all the way to the ground.(Please correct me if I am wrong). So the only walls I can rely on are the core walls. But the thing is the as there are two stair/lift voids in the middle. I have to design them as two diaphrams and as a result, I dont think they can work as core walls (Please correct me if I am wrong), which means the stiffness will be not enough. Any input for the lateral design please? Thanks