Corgas
Materials
- Dec 22, 2008
- 115
Vessel is being built according to ASME Section VIII Div 1.
Contractor came back saying that above mentioned code does not specify UT for nozzles.
I've alwyays thought that Nozzle-to-shell penetration welds shall be 100% UT examined.
Contractor is proposing use of MT and PT in lieu of UT.
By the way, our spec calls for 100%UT but this in not my area of expertise.
Thanks
Contractor came back saying that above mentioned code does not specify UT for nozzles.
I've alwyays thought that Nozzle-to-shell penetration welds shall be 100% UT examined.
Contractor is proposing use of MT and PT in lieu of UT.
By the way, our spec calls for 100%UT but this in not my area of expertise.
Thanks