koo
Structural
- Apr 4, 2003
- 46
guys, got a pricing question about additional charge if I am asked to stamp the calculation and drawings for connection design.
I didn't stamp them before and only submit calcs. for others to stamping (EOR). Now they want me to stamp it. What price diff. does it make on an hourly rate basis? (I know I should cover insurance and add'l hours...but is there a typical industry rate diff. btw. stamping vs. non-stamping?)
Please be specific if you can...thanks.
Koo
I didn't stamp them before and only submit calcs. for others to stamping (EOR). Now they want me to stamp it. What price diff. does it make on an hourly rate basis? (I know I should cover insurance and add'l hours...but is there a typical industry rate diff. btw. stamping vs. non-stamping?)
Please be specific if you can...thanks.
Koo