CAS1
Structural
- May 28, 2013
- 18
Is it normal for an engineer to type his/her draft report directly onto the peer's letterhead and then the peer edit the document without saving a draft? I'm being told that's what HiRise Engineering did with the report for our home and that there are no draft versions of the report. The engineer's signature wasn't even original, there was a shadow around it showing that it had been copy and pasted onto the report. There's no proof of what the original report said and the engineer won't talk to me directly because he said I'm not his customer so he can't talk to me. The report was used to deny my claim and that's why I'm having a problem with the "no draft" answer.