spartan117
Mechanical
- Sep 12, 2018
- 18
On an API 610 datasheet, the option for "Remove casing after test" is shown with the option for non-witness/witness. What does that mean exactly? Is it referring to removal of the casing cover for visual inspection / complete removal of water in the pump casing?
Would this be an option to avoid complete disassembly of the pump after testing?
Would this be an option to avoid complete disassembly of the pump after testing?