connect2
Structural
- Dec 24, 2003
- 306
If a scissor truss comes back from the fabricator with a requirement for horizontal movement of say 0.5", is it ok to allow the top of the wall to translate out 0.5", assuming that this movement can be accomodated. If this movement occurs is the horizontal reaction then released?