Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Siemens Calendar 2014

Status
Not open for further replies.
Replies continue below

Recommended for you

Let check it out and I'll get back to you.

John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
Siemens PLM:
UG/NX Museum:

To an Engineer, the glass is twice as big as it needs to be.
 
Hi,
The cutoff was the 30th of Sep. Maybe John B can pull some strings for you.

Jackie.
 
My problem is that for most of October and November I'm going to be flying all around the country (I just flew home from New York this morning and tomorrow morning I'm off to Salt Lake City, and next week it's Chicago and Minneapolis). I think I'm only in my office for maybe 2 or 3 days between now and Thanksgiving, but I've got an inquiry in so we'll see if I get a response.

John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
Siemens PLM:
UG/NX Museum:

To an Engineer, the glass is twice as big as it needs to be.
 
HI John,

Thanks a lot for your help. I am waiting. Have a look at my image in a small size


Regards
Didier Psaltopoulos
 
I've never gotten anything back that would indicate that they're still taking submissions. Sorry.

John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
Siemens PLM:
UG/NX Museum:

To an Engineer, the glass is twice as big as it needs to be.
 
I'd like to get one, too......Is it too late?

MZ7DYJ
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor