Ravi K Mudragada
Structural
- Oct 24, 2020
- 15
I am struck in a small problem which I hope can sort out with your help. I am running an explicit dynamic integration problem for a fixed beam (3D solid) subjected to a triangular pulse on the top. I have used CDP for concrete. Analysis is converging without any error. But, resulting stresses are not matching with the input stress-strain data. It is not following the input curve (it is giving more stresses than beam capacity). After reaching the capacity of the concrete, stresses are continuously increasing till some extent and then suddenly started following the softening branch of the input curve. I have tried to check the stresses at integration points instead of nodes; tried with full integration; decreased the automatic time step..but nothing has worked out. Can please able to look into this problem. Hoping to hear from you soon. Thank you..!!
PLEASE LOOK AT THE ATTACHED FILE.
PLEASE LOOK AT THE ATTACHED FILE.