Hi.
Would you please help us about technical problem we encountered?
In attached PFD, during normal compressor shut-down operator increases opening of 05-330-FV-015 and 016 (1st and 2nd stage compressor anti-surge valves) and at the same time decreases compressor speed.
When anti-surge controller output signal ("valve demand" as illustrated in attached graph) goes above 70%, 05-330-FV-015 won't open above 70%. Although right after 3 seconds when operator trigger STOP button of compressor and speed decreases more rapidly (which is controlled by compressor logic), 05-330-FV-015 open to 100%.
What is the root cause? Based on the fact that the maximum flow of the control valve is on 80% opening, the Instrument division of our company claimed that restriction on flow causes valve opening limitation, which I think is not reasonable. What do you think?
Thank in advance
Would you please help us about technical problem we encountered?
In attached PFD, during normal compressor shut-down operator increases opening of 05-330-FV-015 and 016 (1st and 2nd stage compressor anti-surge valves) and at the same time decreases compressor speed.
When anti-surge controller output signal ("valve demand" as illustrated in attached graph) goes above 70%, 05-330-FV-015 won't open above 70%. Although right after 3 seconds when operator trigger STOP button of compressor and speed decreases more rapidly (which is controlled by compressor logic), 05-330-FV-015 open to 100%.
What is the root cause? Based on the fact that the maximum flow of the control valve is on 80% opening, the Instrument division of our company claimed that restriction on flow causes valve opening limitation, which I think is not reasonable. What do you think?
Thank in advance