Hi everyone,
Good Day,
Please refer to above, I have a PTB supporting two transfer columns with eccentric torsion moments. The PTB section is not large enough for shear + torsion. I am thinking to use tie beams (B1, B2, B3) against the torsional rotation. Is it feasible?
If so, my questions are
(1) I understand that T2 will be directly resisted by B3. How about for T1? how will it distribute between B1 and B2. Will it distribute depending on the flexural stiffness and distance from the T1 of the each tie beam?
(2) If my tie beams can resist the torsional moment (T1 + T2), do I still need to design my main PTB for torsion?
Thanks