DeepuDivakaran
Mechanical
- May 24, 2016
- 9
Dear Welding, Pipe line Experts,
Please confirm whether 1104 or B31. 8 mandates downhill welding. We have a job in one S/ D to replace around 70 mtrs of corroded transfer pip lines in different locations. Material is API 5L X 65. As it is only 10 nos of 16" joints 9. 35 wall thickness we are planning and confident to complete the joints with E70S3 filler root and E7018 filling and capping in uphill progression. We have previously qualified WPSfor the same. But as per client it is not possible to do uphill progression in pipe lines. But I believe procedure of downhill is following due to time consideration only not based on the code. Your valuable comments is requested.
Please confirm whether 1104 or B31. 8 mandates downhill welding. We have a job in one S/ D to replace around 70 mtrs of corroded transfer pip lines in different locations. Material is API 5L X 65. As it is only 10 nos of 16" joints 9. 35 wall thickness we are planning and confident to complete the joints with E70S3 filler root and E7018 filling and capping in uphill progression. We have previously qualified WPSfor the same. But as per client it is not possible to do uphill progression in pipe lines. But I believe procedure of downhill is following due to time consideration only not based on the code. Your valuable comments is requested.