Hi Guys,
I'm just about to re-vamp our company layer set-ups. The ones we currently use are out of date and engineers don't seem to be adhering to them anyway.
So I'd like to get all our engineers back on path using a new company layer set-up.
So what do you guys use? Any suggestions?
We don't use the Master Model methodology, but I'd like the layers to allow for this if we decide to change to Master Model in the future.
Many thanks,
Andy.
---------------------
Design Draughtsman
Biomet Ltd
I'm just about to re-vamp our company layer set-ups. The ones we currently use are out of date and engineers don't seem to be adhering to them anyway.
So I'd like to get all our engineers back on path using a new company layer set-up.
So what do you guys use? Any suggestions?
We don't use the Master Model methodology, but I'd like the layers to allow for this if we decide to change to Master Model in the future.
Many thanks,
Andy.
---------------------
Design Draughtsman
Biomet Ltd