buzzp

Electrical
Nov 21, 2001
2,032
So I have been with this company for nearly a year and have some real concerns with how things are done and not done. This company has been around for many years and rarely had an EE on staff. Is one needed here? For sure.
Since starting, I have had to gently argue the need to have a service entrance rated transfer switch (3000A service). I managed to win that argument. However, I am learning they are withholding information from me and the field is being redirected, contradictory to what the code allows and my design (ignore the need to have a good design - that don't factor in here at all). For example, they were told to use THHN instead of THHW in our underground raceways. They were told they don't need to test the GF circuit on the 3000A service entrance (with a 3000A main breaker). The MCC building had water running down the inside, almost a mini river, when it rained real hard. They withheld this information from me. I know there is a lot more going on there than I know. Unfortunately, these sites are rural and almost never have an electrical inspection. To make matters worse, we have two master electricians on site, who should know the code, who are simply doing what they are told even if it means a violation of code.
I have since learned one of our PE's (structural), who stamps the structural drawings and is employed here has a written agreement with the boss that if something happens due to the boss changing the design, that she will not be liable.
I am at a loss as to what to do. I can't just leave this alone. I know there are many other violations of code. Obviously, I am looking for another job. Should I report these violations to the customer? To the AHJ (if I can find one)? What about the PE with a secondary agreement not to be liable in the event of a problem due to the boss changing the design (like leaving out rebar the engineer wanted)?
Thank you.
 
Replies continue below

Recommended for you

Maybe their insurer can comment, I'm sure for working out premiums they might be interested in some anonymous information related to possibilities.
 
dik, I have obligations as the engineer to report this, which I got fired for fulfilling. In my mind, this should release me of any liabilities. As I stated before, I don't hold my PE license, never really needed it in my 20 years of experience. Yes, I do have a formal education with a BSEE.



 
OP:
You did the correct thing... and you were harmed in the process. It's too bad that the regulatory process fails.

Dik
 
Status
Not open for further replies.