bob96
Structural
- May 21, 2007
- 15
For the 200 pound concentrated and 50 plf handrail/guardrail loads in the IBC, when designing wood members what is the NDS load duration that should be used? Ten minute = 1.6? Is there a NDS or IBC code statement that specifies the load duration?
Thank you