Thmierzwa
Civil/Environmental
- Jul 1, 2009
- 3
Hi all,
I have a 24' long Spruce Pine Fir Fink Truss (all 2x4) that have a broken top and bottom chord along the left end of truss before the web splice plates. The peak is 4' high and the web diagonals connect the bottom chord at 8' from the end (spacing is 8-8-8). The top chord connection for the webs is about 6'6" along the top chord from the end (corresponding to about 6 feet in the x direction from the bottom chord end). I want to design a fix since replacement would be way to costly.. My loads are 50# snow and 12# DL.. The spacing is 2 feet on center. Currently I plan on splicing along the top chord, second web leg, and bottom chord on good wood using 3/4" CDX sheathing and a plethora of 10d?? nails/screws. Any idea on a pattern, size, length of the splices/gussets on the members?
I have a 24' long Spruce Pine Fir Fink Truss (all 2x4) that have a broken top and bottom chord along the left end of truss before the web splice plates. The peak is 4' high and the web diagonals connect the bottom chord at 8' from the end (spacing is 8-8-8). The top chord connection for the webs is about 6'6" along the top chord from the end (corresponding to about 6 feet in the x direction from the bottom chord end). I want to design a fix since replacement would be way to costly.. My loads are 50# snow and 12# DL.. The spacing is 2 feet on center. Currently I plan on splicing along the top chord, second web leg, and bottom chord on good wood using 3/4" CDX sheathing and a plethora of 10d?? nails/screws. Any idea on a pattern, size, length of the splices/gussets on the members?