Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Deener

    Lateral Loading for Fall Arrest Gantry Beams

    Thanks guys. Really appreciate the responses. I'm proceeding with applying the 3.6 kip vertical and the horizontal component of 3.6 kip at 45 degrees. While I have your attention, what kind of deflection criteria for lateral and vertical would you design for? This not being an occupant comfort...
  2. Deener

    Lateral Loading for Fall Arrest Gantry Beams

    Hey guys, I'm designing a stand alone structure that supports a fall arrest system. It's inside a tractor trailer factory where workers walk atop tankers to perform maintenance. The company needs trolley beams overhead two adjacent bays that the workers can connect to for fall arrest. Top of...
  3. Deener

    Eaves beam in LFRS in a Portal Frame Steel Building

    Hey guys, Working in a post disaster category steel portal frame building in Ontario, Canada. We're adding some misc metals to the building which was erected about 10 years ago. While on site and while looking through the drawings, I like to imagine load paths. The building contains portal...
  4. Deener

    Industrial Stair Design as Per NBCC

    Hi All, I'm designing a set of free standing interior stairs which access a mezzanine. Distance from mezzanine to ground level is about 3.4m. The EOR wants the stairs to be freestanding to avoid any point loads on the mezzanine which consists of hollow core slabs. In this case, is it reasonable...
  5. Deener

    Structural Fees - Non Standard OWSJ Analysis

    Hi All, Thanks for the great feedback. Here's my best shot at addressing your comments. @phamEng - I got wind that a large engineering firm was charging $2800 CDN. That seemed a little low. I figured I was going in around $3500 to $5000 @ Dave Atkins -scissor lift is provided and I'm the...
  6. Deener

    Structural Fees - Non Standard OWSJ Analysis

    Hey guys, Looking to get a sanity check on reasonable rates for a structural analysis. I've had a few projects that involve the evaluation of an existing OWSJ for additional loading (i.e. rooftop unit, pipe hangers, etc). Here's a breakdown of what the work involves: 1. Site visit for OWSJ...
  7. Deener

    Evaluation of Top Chord in OWSJ - Limit State of Buckling

    Hey guys, I'm evaluating the capacity of an existing OWSJ and am determining whether or not reinforcement will be required. Client wants to give occupant access to the roof area (additional 4.8 kPa loading). I'm using Skyciv to determine the factored loads in each member. A coworker has me...
  8. Deener

    Eaves Connection Detail in Steel Portal Frame

    Thanks Hokie and Jayrod. I love that idea. Get that connection closer to the inflection point. Unfortunately the architect has shut that idea down since they are concerned the splice is much more visible in that case. Sigh.
  9. Deener

    Eaves Connection Detail in Steel Portal Frame

    Thanks IceNine. That's a great point about additional shear on the bolts.
  10. Deener

    Eaves Connection Detail in Steel Portal Frame

    Thanks PhamENG. Unfortunately there's an HSS tie beam connecting each portal frame at that point. See highlighted member below:
  11. Deener

    Eaves Connection Detail in Steel Portal Frame

    Hi All, Currently exploring different options with the architect for the eaves connections in an exposed steel portal frame. The roof angle is relatively high (about 33 degrees to the horizontal) so the roof angle needs to be followed all the way to the far flange of the column (as opposed to...
  12. Deener

    NBCC - Geometric Requirements of Industrial Stairs

    Thanks for the responses. This is what I could find in the Canadian OH&S: https://www.laws-lois.justice.gc.ca/eng/regulations/SOR-86-304/page-2.html I'm really seeing no requirement at all for these stairs in terms of rise, run, and landings.
  13. Deener

    NBCC - Geometric Requirements of Industrial Stairs

    Hey guys, I'm laying out a set of interior stairs that will provide roof access for maintenance (monthly access for changing filters of some kind). This is a large factory (>600m^2) and the client wants to keep the footprint of the stairs to a minimum. Stairs are preferred over a ladder as the...
  14. Deener

    Rigid Frame Design with Cantilever W beams and HSS Columns

    KootK and Jayrod12 - Thanks for the very useful points. Give me some time to address each of your points so my response is succinct and constructive. In the meantime, let me shed some more light on the situation. 1. The hot tub is on one structure and the 5" concrete slab is on the other. In...
  15. Deener

    Rigid Frame Design with Cantilever W beams and HSS Columns

    KootK, you are the best. Thanks so much for the intelligent comments. I'll address your comments and perhaps spark more points. 1. I completely agree. Although I show beam members 28 and 29 in the picture, I have evaluated both structures as independent. Point loads have been used in place of...
  16. Deener

    Rigid Frame Design with Cantilever W beams and HSS Columns

    Hi All, Looking for some opinions on the design below. It’s an outdoor patio which is only connected to the adjacent structure at the top of the three columns in the right side of the picture below (supporting overhanging roof structure). For scale, the platform consisting of wide flange beams...
  17. Deener

    Base balustrade moment connection

    I would consider this more of a pinned connection if only the web of the beam is connected to the fin plate. If you want to transfer the moment from the beam and into the fin plate, I would think that the flanges should be connected to the fin plate. Assuming you can transfer the moment into...
  18. Deener

    Engineering a Glass Floor Panel

    Thanks for the helpful comments everyone. I've added a picture below to better explain the occupancy loading I'm hoping for on my deck. Lots of valid concerns here.My thoughts below. If I can't get more information on the glass piece, I think I'll scrap this idea. 1. Do not use the glass...
  19. Deener

    Engineering a Glass Floor Panel

    Hey guys, I'm designing and building my back deck. I've got an opportunity to use a 5' x 6' x 5/8" thick piece of glass that my friend salvaged from a Victoria Secret runway (high five). I have zero experience with the mechanical properties of glass. For those of you with experience, I would...
  20. Deener

    Beam Splice - Welded with Limited Access

    Originally the beam was continuous. This is a retrofit and the slabs were not originally designed to take the additional weight of the heat exchangers so these are reinforcing beams. The contractor is requesting the splice because it will be nearly impossible to get the long continuous beam into...

Part and Inventory Search