  1. 9wearSuave

    Synchronizing solar,wind, and grid

    Most inverters are equipped with anti-islanding feature to prevent the case you are describing OP
  2. 9wearSuave

    NERC standard - Trying to understand

    You’re asking us to provide a standalone document when there are hundreds of standards spread across lots of disciplines. You’re going to need to be more specific
  3. 9wearSuave

    Surge arrester connection

    Both connections are the same. The only time option 2 is used depends on how the equipment is laid out (ie, making sure jumpers are trained properly)
  4. 9wearSuave

    GSU winding configuration for solar farms

    Hello, We have typically been designing large scale PV plants with Y-D-Y GSU's with a NGR on X0. Why not use a Y-D transformer and use novel methods of detecting ground faults (3V0)? I understand that you would need to do a more in depth insulation study because of the larger neutral shift and...
  5. 9wearSuave

    Step/touch potentials inside the ground grid Vs at the edges

    not really much you can do about step potentials at the periphery other than spending needless money to lower the overall GPR below the tolerated step potential.
  6. 9wearSuave

    Proper Test Switch Wiring

    We wire test switches on both positive and negative side of the relay output contacts only. You don't want to wire a test switch directly inline to the breaker trip coils for obvious reasons. Any testing of the breaker trip circuit needs to be done when the breaker is isolated from the system.
  7. 9wearSuave

    SEL-351S CT Saturation Protection can someone explain simply ?

    Hi Davidbeach, I understand maintenance mode settings drop the instantaneous setting low temporarily. I was referring to the af levels during normal operation.
  8. 9wearSuave

    SEL-351S CT Saturation Protection can someone explain simply ?

    I agree with other sentiments that the engineer should provide justification for the setting values. I think it’s worth noting that the instantaneous element of a relay usually isn’t used for mitigating arc flash, but more for protecting equipment from serious damage. Arcing current *usually*...
  9. 9wearSuave

    LRG - 400A Vs FLA of Transformer secondary

    If the fla of the transformer is higher then 400A, I suppose. But if the allowable GF current is higher it’s much easier to detect and trip/alarm.
  10. 9wearSuave

    LRG - 400A Vs FLA of Transformer secondary

    Probably when you want the system to run continuously under ground fault conditions, where there are only alarms for ground faults.
  11. 9wearSuave

    Low Magnetic Field Overhead Line Solutions

    Are 2 of the phases "split" and then the 3rd phase is in the middle perhaps?
  12. 9wearSuave

    Relay 87 (Differential Current) For Transformer

    You’d probably need to make 2 groups of pickup settings that switch whether the gen is on or off.
  13. 9wearSuave

    Soil resistivity measurement

    I assume you’re referring to the amount of traverses for a site. I’ve only seen 2 traverses conducted at different sites, but I could imagine if a site contained a discontinuous soil makeup, more traverses would be a good idea.
  14. 9wearSuave

    ETAP Single Line Diagram

    I don't think sticking a single line diagram in ETAP (or any computer aided design and analysis program for that matter) will get you very far in learning about electrical power components. If you happen to select the correct component, you would need to then add necessary parameters. This...
  15. 9wearSuave

    Do I need a tertiary?

    Depends. How much unbalance are we talking about?
  16. 9wearSuave

    Effective grounding

    I agree with the above. It doesn’t seem to be in the best interest of the utility to add a ground further into your system as that would desensitize their relays.
  17. 9wearSuave

    REF - In Zone Faults - Voltage across relay terminals with Stabilizing resistor

    Why would the measured fault current be lower than a through fault? In any case, it doesn’t matter so much the magnitude of the fault, as much as the comparison between the residual current and measured In (3I0). If it’s an external fault, Ig and In would be in phase and wouldn’t operate the...
  18. 9wearSuave

    Soil Resistivity Measurement

    I do not believe it is required. When calculating step and touch potential formulas at the substation, sometimes a split factor estimation is used for 4 wire distribution lines or transmission lines with OPGW's, which is where pole grounding resistance would come into play. But these are just...
  19. 9wearSuave

    Sizing NGR Neutral Cable

    Correct The equipment bonding jumper size for the NGR is not necessarily the same as the neutral conductor to the NGR. It is sized based off NEC 250.36 (G)
  20. 9wearSuave

    Sizing NGR Neutral Cable

    I believe the code is referring to NGR let thru current, not continuous rating. Obviously you could plot different cables in a TCC curve and see that you’d probably be able to get by with a smaller cable but the code is code unfortunately.